Edit/Cancel Order

Kindly send an e-mail to shoponline@linyalinya.ph SUBJECT: [ORDER NUMBER] [EDIT/CANCEL ORDER] Please indicate what changes you would like to make if you'd like to edit your order.
Size Chart

T-SHIRT MEASUREMENT

(Regular Shirts - ADULTS) 

Updated as of July 2020 

Please note that all shirts released starting July 2020 follow this new size chart.

The release dates of 2020 shirts are already indicated in their product descriptions for your reference.

Old Designs (before July 2020) follow the old size chart.

 

TOLERANCE: (+/-) 1/2 inches for all sizes

ADULT SIZE SHOULDER WIDTH LENGTH
2XS 15" 17" 24"
XS 16" 18" 25"
S 17" 19" 26"
M 18" 20" 27"
L 19" 21" 28"
XL 20" 22" 29"
2XL 21" 23" 30
3XL* 22" 24" 31 1/4"
4XL* 23" 25" 32

 

*3XL sizes are only available for selected shirts as of now
(e.g. selected Eraserheads/collab shirts)
*4XL - Comedy Manila shirts

BELLY GOOD T-SHIRTS

Please note that Belly Good shirts have a curved hem.

 TOLERANCE: (+/-) 1/2 inches for all sizes

BELLY GOOD SIZE SHOULDER CHEST/WIDTH LENGTH
XS 16" 20 3/4" 25 3/4"
S 16 3/4" 21 1/4" 26 3/4"
M 17 3/4" 21 3/4" 27 1/2"
L 18 1/2" 22 3/4" 29"
XL 19 1/2" 23 3/4" 30"
2XL 20 3/4" 25" 31"

 

CROP TOP

TOLERANCE: (+/-) 1/2 inches for all sizes

CROP TOP SIZE SHOULDER CHEST/WIDTH LENGTH
2XS 17" 16" 14"
XS 17 1/2" 17" 14 1/2"
S 18"
18"
15"
M
18 1/2"
19"
15 1/2"
L 18 1/2"
20"
16"
XL 19" 21" 16 1/2"
2XL 19 1/2" 22" 17"

 

 

KIDS T-SHIRTS

TOLERANCE: (+/-) 1/2 inches for all sizes
 
KIDS T-SHIRTS AGE* SHOULDER CHEST WIDTH LENGTH
2
0-12 Months
7 1/4" 9 1/4" 16"
4 1-2 Yrs Old 10" 11 1/4" 17"
6 3-4 Yrs Old 12 1/2" 13 1/4" 18 1/4"
8 5-6 Yrs Old 13 3/4" 14 1/4" 19 1/2"

*Note: These are just age recommendations; size will still vary based on the height/weight of the kid

 

KIDS T-SHIRTS (NEW SIZING)

DESIGNS: Emote Control, Gutomatic, Iyakin Pero Strong, Saling Kitkit, Hug Life, Minsan Mabait

TOLERANCE: (+/-) 1/2 inches for all sizes
 
KIDS T-SHIRTS AGE* SHOULDER CHEST WIDTH LENGTH
2
0-12 Months
8 1/2" 9 3/4" 14 1/2"
4 1-2 Yrs Old 10 1/2" 11 3/4" 15 3/4"
6 3-4 Yrs Old 12 1/2" 13 3/4" 16 1/2"
8 5-6 Yrs Old 14" 14 3/4" 18"

*Note: These are just age recommendations; size will still vary based on the height/weight of the kid

 

 

KIDS SHORTS

TOLERANCE: (+/-) 1/2 inches for all sizes

KIDS SHORTS AGE* WAIST LEG WIDTH LENGTH
2 0-12 Months 7" 6 1/4" 11 1/2"
4
1-2 Yrs Old
7 1/4" 6 1/2" 12"
6
3-4 Yrs Old
7 1/2" 6 3/4" 12 1/2"
8
5-6 Yrs Old
8" 7" 12 3/4"
*Note: These are just age recommendations; size will still vary based on the height/weight of the kid
 

SLIDES MEASUREMENT

 EURO US
36 3
37 4
38 5
39 6
40 7
41 8
42 9
43 10
44 11
45 12